Project Highlight: Ponemah Fire HallApril 19, 2021 The Need: Ponemah and the surrounding areas did not have an operational firehall on hand prior to construction, making this project extremely important for the community. The nearest firehall before this construction project was approximately 45 minutes away, making any firefighting in Ponemah a serious challenge. This new [...]
Project Highlight: Red Lake Fire HallApril 2, 2021 The Finished Product: The Red Lake Fire Hall is a 10,000 sq. ft. pre-engineered metal building with 4-vehicle bays that is attached to a wood frame office structure including offices for fire personnel, a fitness center, gear turnout room, decontamination shower room, training room, a kitchen, and [...]
Project Highlight: Toppan Merrill Office and Warehouse AdditionFebruary 26, 2021 The Finished Product: The Toppan Merrill Office & Warehouse Addition was a renovation and expansion of Toppan Merrill’s Sartell location. The project consisted of a new 56,519 Sq. ft. expansion to their warehouse and an 13,500 SF office addition. The addition includes conference rooms, office [...]
Project Highlight: MCTC Student Affairs Renovation Phase 1 and 2February 19, 2021 The Finished Product: The Minneapolis Community and Technical College Student Affairs Renovation is a 43,000 sq. ft. remodel. Located in downtown Minneapolis, this multi-phase project includes offices, presentation spaces, student service counters and help center, accounting and onboarding services, and customer services. [...]
A Tribute To Donlar’s Co-Founder, Donald A. KainzFebruary 12, 2021 We at Donlar Construction are saddened to announce the recent passing of Donald A. Kainz. Don was a co-founder of Donlar Construction; He is the “Don” in “Donlar”. He is the father of Jon Kainz who is now the Principal in Charge as well as [...]
Recent Posts Project Highlight: Ponemah Fire Hall Project Highlight: Red Lake Fire Hall Project Highlight: Toppan Merrill Office and Warehouse Addition Project Highlight: MCTC Student Affairs Renovation Phase 1 and 2 A Tribute To Donlar’s Co-Founder, Donald A. Kainz 2020 Project Highlight – Lakeside ElementaryJanuary 29, 2021 The Finished Product: Lakeside Elementary is a newly [...]
2020 Project Highlight: New Hope Outdoor Pool and WaterparkDecember 21, 2020 The Finished Product: The New Hope Pool is an outdoor aquatic center featuring a 50-Meter lap pool, a speed, drop, and flume water slide, a current channel and vortex pool, and a recreational zero-depth splash pool. Located adjacent to the New Hope City Hall, [...]
Donlar Construction Participates as Level One Member of Chase Partnership in 2020December 15, 2020 Donlar Construction places safety above all else. This is why, in 2019, Donlar Construction applied to join the CHASE (Construction Health And Safety Excellence) Program. The program is a partnership between Minnesota OSHA & AGC of MN, and is designed to [...]